One cubic yard of #57 crushed stone weighs 2,700 lb (1.35 US tons) and covers 108 sq ft at 3 inches deep. A 20×10 ft driveway pad at 3 in deep with a 10% compaction buffer requires 2.04 cubic yards (2.75 US tons).
Worked Example: 20 ft × 10 ft Driveway Pad (3 in Depth)
Suppose you are surfacing a 20 ft × 10 ft parking pad with 3 inches of #57 Crushed Stone (2,700 lb/cu yd) and a 10% compaction buffer:
- Net Volume: 20 × 10 × (3 ÷ 12) = 50.00 cu ft (1.8519 cu yd, 2.50 US tons net)
- Order Volume (+10%): 50 × 1.10 = 55.00 cu ft (2.0370 cu yd)
- Order Weight: 2.0370 × 2,700 ÷ 2,000 = 2.75 US tons (or 110 × 0.5 cu ft retail bags).
Aggregate Material Density Comparison
| Aggregate Type | lb / cu yd | US Tons / cu yd | Typical Project |
|---|---|---|---|
| #57 Crushed Stone (3/4 in) | 2,700 lb | 1.35 tons | Driveways, French drains, slab base |
| All-Purpose Gravel | 2,835 lb | 1.42 tons | General fill & utility beds |
| Pea Gravel (3/8 in) | 2,592 lb | 1.30 tons | Walkways, patios, play areas |
| Crusher Run / Road Base | 2,970 lb | 1.49 tons | Compacted paver & driveway sub-base |
| River Rock | 2,403 lb | 1.20 tons | Dry creek beds & decorative borders |
Frequently Asked Questions
Should I order gravel by the ton or by the cubic yard?
Quarries and landscape yards almost always weigh dump-truck loads on a scale and bill by the US ton (2,000 lb) or metric tonne. HomeCalc Pro calculates both.
Why add a 10% compaction buffer to gravel?
Angular crushed stone and crusher run settle and lock together by 10–15% when tamped with a plate compactor.
How deep should a gravel driveway be?
A new driveway typically needs 4 inches of compacted crusher run base topped with 2–3 inches of #57 crushed stone.